From: route@monster.com
Sent: Friday, April 15, 2016 10:20 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Vincent Alley 4716 N Cerritos Dr. Tucson, AZ 85745 Vincentalley88@yahoo.com 903-262-0065 Summary A Construction Manager / Superintendent with a
solid history of achievements in working safely and meeting project
objectives. A motivated leader with strong organizational and prioritization
abilities. Areas of expertise include: · 10M -
200M - EPCM Construction builds, Construction Reliability and Operations
& Maintenance with a focus on Safety, Production, Budget and Quality
Control. · Heavy
Civil / Concrete, Structural, Architectural, Mechanical, HVAC, Electrical,
Welding and Piping scopes of work. · Industrial,
Commercial, Government, Oil & Gas, Highways & Bridge structure,
facility and infrastructure builds. · Cold
Storage & General Warehousing facilities, Offices, Man Camps, Refinery
Systems, Mining Process Systems, Substations, Government Facilities – Hangers
/ Billeting / Hospitals / infrastructure / Forward Operation Base O&M
& Construction Operations Management & Large Scale Solar builds. Skills · Construction
Management / Supervision · Engineering
and Design field / office support · Operations
& Maintenance / Reliability · Material
Management & Procurement · Project
Coordination · Construction
Planning · Job
Costing & Forecasting · Contract
& Vendor Negotiations · Document
Control: RFI’s, Submittals, Turn Over Packages, Project
Manuals, etc. · Time
Management · Problem
Solving & Team Building · A
career history from hands on construction: (Dump truck, Boom & Scissor
lifts, Track drill, Core drill, Fork lift, Various hand tools, Welding,
Piping, Mechanical build & O&M, Excavating, Concrete pour & form,
Shot Crete, Jackleg, Coax & Fiber cabling, Etc.) · Safety
Training: OSHA 30, EM 385-1-1, MSHA and various corporate safety programs
(ZERO Harm etc.) · Smart
Plant, AutoCAD, Navis Works, Primavera, Microsoft Project, Ellipse, Maximo,
Mat Man, Lotus Notes, Excel, Windows, Adobe, PowerPoint and more. Experience Construction
Planner ARTECH
(COX Communications project) Tucson,
AZ Aug
2015 – Present Manage
construction progress, QA/QC and Safety Audit. Field walk and inspect
projects for planning. OSP management establishing works orders and assign
contractors per scopes of work. Manage the project progress and budget. Plan
constructability and maintain reliability. Coordinate client assigned work
orders and communicate progress. Coordinate and oversee aerial and
underground fiber optic and coax ring construction. Construction
Management Consultant Self
Employed Tucson,
AZ – (Projects in Union City & CA / Fayetteville, AR) May
2014 – Aug 2015 Performed
OSP Construction Management / Supervision for various clients. Project
coordination, Quality Control, Planning and Scheduling, Conflict resolution,
start up and turn over coordination, performed safety audits. VA
Hospital Operating Room Refurbishment clean room environment, Cold storage
warehouse modification and refurbishment. Heavy concrete slabs & tilt up
walls, Electrical system scopes of work, Mechanical systems set including
plenum, HVAC placement and piping systems. Document control, Material
procurement, Vendor coordination, Subcontractor coordination, Client
communication, Document all activity delays and budget data. Maintain cost
and schedule. Assistant
Construction Manager Tech
USA (Premiere Builders Project) Morenci,
AZ (Rio Tinto Concentrator Upgrade Project) Feb
2014 – May 2014 Short
term project. Manage in house construction personnel and subcontractors for a
copper mine concentrator process structure large scale tear out and refurbish
& new build. This project was large scale industrial piping, structural
and electrical builds. Multiple project fronts build to system priorities.
The build included 2 large office, eating and control room areas that were
completely refurbished. High works and underground tunnel work. I maintained
document control, procurement and managed field activity for safety,
production, quality, design conflict resolution, testing. Maintained detailed
field reports and attended multiple coordination meetings updating other
contractors, management and the client on progress. Construction
Manager Fluor Salt
Lake City, Utah (Rio Tinto Copper Mine Cornerstone Project) Sept
2012 – May 2013 65 M -
Build piping and mechanical scope of work packages per system priority.
Coordinated all phases of construction with various contractors and
craft. Managed field Superintendents to ensure project safety, quality
and schedule objectives were maintained. Worked closely with the client,
subcontractor and vendor management on procurement, material management and
staging. We
maintained the site for night work providing compliant lighting, snow removal
and safety awareness. Coordinated
heavy concrete forming / pours, mechanical sets, piping fabrication / system
sets, block & tilt up wall and electrical for the new construction
and tie ins. Maintained detailed field reports and attended multiple
coordination meetings updating other contractors, management and the
client on progress. Construction
Manager Fluor Elko,
NV (Barrick Rodeo Copper Mine Paste Plant Project) Jul
2011 – Aug 2012 45M -
Manage multiple craft scopes including civil, excavation, concrete form &
pour, mechanical sets, piping builds, electrical installs. The job consisted
of tying into the existing dry ball mill / concentrator structure then
running new piping via pipe bridge and underground, to the new build. A
large section of haul road was excavated and a load bearing culvert
constructed for piping access. Maintain records of Aggregate, compaction,
concrete, steel, piping, welding testing results. Record all field measurements
for system equipment, piping and steel sets. Performed safety and
environmental audits. Built project turn over packages. Performed document
control and coordinated RFI / Submittal information. Maintained detailed
field reports and attended multiple coordination meetings updating other
contractors, management and the client on progress. OSP
Construction Management - Mechanical / Piping Superintendent Fluor
(International) Mongolia
(Rio Tinto Oyu Yolgoi Copper Mine Project) Nov
2010 – Jun 2011 130M -
Managed the construction of Piping, Mechanical and Concrete scopes of work.
Worked with multiple international contractors from Mongolia, China,
Philippines, Thailand, Australia and the USA. Maintained detailed field
reports and attended multiple coordination meetings updating other
contractors, management and the client on progress with the use of
interpreters. Coordinate piping and mechanical materials and equipment for
multiple process systems. Record all field measurements for mechanical equipment,
piping and steel sets. Perform safety audits and advised contractors on safe
construction. Army
Asset Technical Team Lead Fluor
(International) LOGCAP
IV Afghanistan Project Mar
2009 – Sept 2010 200M -
Project manager leading a team of subject matter experts (Plumbing,
Electrical, Power Gen, Structural and Mechanical), throughout Afghanistan
forward operating bases verifying and inspecting Army assets building work
orders as needed and coordinated aircraft hangar, billeting, flight
line and equipment pad concrete, Stack container and B-hut and various
construction builds. Coordinate air and land transports with military
security and FOB management. Compiled asset data and sent reports into
headquarters management. Construction
Superintendent Fluor Elko,
NV (Roaster Mill Shutdown Project) Jun
2008 – Feb 2009 1.5M -
Part of a subject matter expert team sent in to evaluate and document the
shutdown of a dry mill roaster to develop construction procedures that could
improve schedule, budget, safety and down time. We consulted with department
leads and contractors on over 42 mechanical, electrical and O&M work
orders. Project
Manager / Job Representative Fluor Morenci,
AZ (Freeport McMoran Mill, Floatation and Grind Upgrade Project) May
2006 – May 2007 10M -
Manage the construction of multiple projects including: SO2 system, X-Ray
Analyzer, Synchronous Water Pumping System, Rock Crusher O&M Upgrade,
Crusher Lubricant System, Fire Suppression System, Tailings Thickeners and
more. Developed a site safety module to improve and sustain production goals.
Developed Standard operating procedures, roles and responsibility packages.
Performed pre and post project walk downs with client, contractors and
vendors. Projects were self-perform and subcontracted. Maintained QA? QC for
contract management. Coordinated all phases of construction including:
Concrete demo/forming and pours, Equipment and material laydown, material
procurement and transport, mechanical, structural, HVAC. Built project turn
over packages. Performed document control and coordinated RFI / Submittal
information. Maintained detailed field reports and attended multiple
coordination meetings updating other contractors, management and the client
on progress. Construction
Manager - Disaster Recovery Team Lead Fluor Lake
Charles / New Orleans, LA (FEMA project throughout central LA) Jun
2005 – Apr 2006 25M -
Managed a team of electrical, mechanical and structural subject matter
experts inspecting post hurricane damage to homes, businesses and infrastructure.
Field evaluates damage and develop work orders to refurbish, repair or
replace structures. Plan and coordinate the installation of electrical, power
gen, sewage and water infrastructure for large scale man-camps. Scheduled,
planned and placed mobile homes and travel trailers for displaced citizens.
Managed bulk concrete, piping projects for multiple industrial properties and
refineries. Managed a document control team at the Lake Charles field office.
Maintained detailed field reports and attended multiple coordination meetings
updating other contractors, management and the client on progress. Evaluate,
Refurbish and Construct airfield and industrial facilties. Construction
Manager - Disaster Recovery Team Member Fluor
(TRS) Melbourne,
FL (FEMA project throughout central FL) Feb
2004 – May 2005 25M -
Performed as a construction team subject matter expert managing the
installation of electrical, mechanical and structural subject matter experts
inspecting post hurricane damage to homes, businesses and infrastructure.
Field evaluate damage and develop work orders to refurbish, repair or replace
structures. Plan and coordinate the installation of electrical, power gen,
sewage and water infrastructure for large scale man-camps. Scheduled, planned
and placed mobile homes and travel trailers for displaced citizens. Managed
bulk concrete, piping projects for multiple industrial properties and
refineries. Managed a document control team at the Lake Charles field office.
Maintained detailed field reports and attended multiple coordination meetings
updating other contractors, management and the client on progress. Construction
Superintendent MSX
International (Fluor Project) San
Francisco, CA / Dallas, TX (WorldCom projects throughout the Bay Area and Dallas
Area) Mar
2000 – Aug 2002 68M –
OSP
Managed the construction of the new fiber optic backbone being installed
throughout the Bay Area underground and building interiors. Coordinated all
construction with various city permitting offices, utilities and rail road
for construction with core drilling, conduit placement, cable splicing, man
hole and vault placement and access, cable pulls and commercial building
interception and com room install. Coordinate traffic control and safety /
environmental control. Review contractor daily progress and maintain turnover
documentation with as builds. Maintained detailed field reports and attended
multiple coordination meetings updating other contractors, management and the
client on progress. Education United
States Air Force (Honorable Discharge 1990) Non
Commissioned Officer Training Anchorage,
AK Tyler
Jr College Petroleum
Engineering (Not Complete) Tyler,
TX ATI
Health Education Center Medical
Assistant Dallas,
TX Online
Courses OSHA
30, EM 385-1-1 Various
locations MSHA
and various corporate safety programs (ZERO Harm etc.) Online I
continue to pursue online education Current Thank
you for time, I look
forward to hearing from you soon. Vincent
Alley |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|